|
Step 1. Pool design. Creating your
Backyard paradise.
Step 2. Stake out and excavation of pool
with heavy equipment.
Step 3. Steel 3/8- inch steel on 4 inch
by 8 inch centers at stress points and
deep
end. 3/8-inch steel on 8 inch by 8 inch centers throughout
structure.
Step 4. Stub plumbing will set main drain and
skimmers.
Step
5. 100% volumetric gunite with minimum of 4,800 PSI
strength.
Minimum
6 inches gunite walls, and over 9 inch gunite floor and coves.
It is applied under light pressure to bind tightly around the
steel, for ultimate
strength.
Step
6. The plumbing is designed to take advantage of the most
efficient equipment on
the market today. We install quality, long term cost efficiency,
and reliability.
Since it is designed to handle constant flow rates and pressure
demands, one
component cannot overwork another. It comes with a "3 year
limited"
manufacturer warranty.
Step
7. Electrical all equipment is wired, grounded and bonded by
a licensed electrician.
Step 8. Tile and coping will be installed around the
perimeter of your pool. Ceramic
or flagstone waterline. Bullnose or flagstone coping.
Step
9. Your choice of concrete, stone, spray deck, etc.
Step
10. White marble plaster will be provided.
Step
11. Start Up We will provide you with operation and
maintenance instructions.
NOW ENJOY YOUR BACKYARD PARADISE!
|